What this calculator helps you see
This calculator estimates how much reporting time is being absorbed by avoidable friction after drafting starts or as the draft moves toward sign-off. It is useful when the report itself feels slow, but the real problem may sit in the work that happens around the draft.
- monthly reporting overhead hours
- monthly hours that could potentially be removed
- monthly and annual cost tied to that drag
- the biggest reporting bottleneck category
- whether the stronger fix is likely to sit in retrieval, source control, coordination, or document handling